×
近期发现有不法分子冒充我刊与作者联系,借此进行欺诈等不法行为,请广大作者加以鉴别,如遇诈骗行为,请第一时间与我刊编辑部联系确认(《中国物理C》(英文)编辑部电话:010-88235947,010-88236950),并作报警处理。
本刊再次郑重声明:
(1)本刊官方网址为cpc.ihep.ac.cn和https://iopscience.iop.org/journal/1674-1137
(2)本刊采编系统作者中心是投稿的唯一路径,该系统为ScholarOne远程稿件采编系统,仅在本刊投稿网网址(https://mc03.manuscriptcentral.com/cpc)设有登录入口。本刊不接受其他方式的投稿,如打印稿投稿、E-mail信箱投稿等,若以此种方式接收投稿均为假冒。
(3)所有投稿均需经过严格的同行评议、编辑加工后方可发表,本刊不存在所谓的“编辑部内部征稿”。如果有人以“编辑部内部人员”名义帮助作者发稿,并收取发表费用,均为假冒。
                  
《中国物理C》(英文)编辑部
2024年10月30日

Get Citation
ZHANG Meng, LU Yuan-Rong, PENG Shi-Xiang, ZHU Kun, YAN Xue-Qing, GAO Shu-Li, WANG Zhi, GUO Zhi-Yu, ZHAO Jie, FANG Jia-Xun, LI Wei-Guo, GUO Ju-Fang, YUAN Zhong-Xi, SONG Zhi-Zhong, YU Jin-Xiang, YU Mao-Lin and CHEN Jia-Er. Upgrading of a Heavy Ion 1MeV ISR RFQ Accelerator[J]. Chinese Physics C, 2008, 32(S1): 262-264.
ZHANG Meng, LU Yuan-Rong, PENG Shi-Xiang, ZHU Kun, YAN Xue-Qing, GAO Shu-Li, WANG Zhi, GUO Zhi-Yu, ZHAO Jie, FANG Jia-Xun, LI Wei-Guo, GUO Ju-Fang, YUAN Zhong-Xi, SONG Zhi-Zhong, YU Jin-Xiang, YU Mao-Lin and CHEN Jia-Er. Upgrading of a Heavy Ion 1MeV ISR RFQ Accelerator[J]. Chinese Physics C, 2008, 32(S1): 262-264. shu
Milestone
Received: 2008-01-11
Revised: 1900-01-01
Article Metric

Article Views(3643)
PDF Downloads(1046)
Cited by(0)
Policy on re-use
To reuse of subscription content published by CPC, the users need to request permission from CPC, unless the content was published under an Open Access license which automatically permits that type of reuse.
通讯作者: 陈斌, [email protected]
  • 1. 

    沈阳化工大学材料科学与工程学院 沈阳 110142

  1. 本站搜索
  2. 百度学术搜索
  3. 万方数据库搜索
  4. CNKI搜索

Email This Article

Title:
Email:

Upgrading of a Heavy Ion 1MeV ISR RFQ Accelerator

    Corresponding author: ZHANG Meng,

Abstract: This paper presents new beam test results for O+ beam on a high current Integral Split Ring Radio Frequency Quadruple (ISR RFQ) accelerator. After the upgrading, a new designed 2.45GHz O+ ECR Ion Source can provide a beam with macro-pulse peak current of 4mA at the injection point behind a 15mm diaphragm, whose O+ factor is 60%—80% varied with gas flow rate and the normalized rms emittance is less than 0.15πmm﹒mrad. The accelerated O+ beam current goes up to 2mA with the transmission of about 80% at 45kW RF power with duty factor 1/6 (pulse duration of 1ms and repetition frequency of 166Hz). The upgraded RF power system includes low level RF pulse modulation amplifier, AGC, 3W and 20W preamplifiers, 1kW driver and 30kW final amplifier, which can output nearly 50kW in pulsed mode. The vacuum has been improved, too. The upgraded 1MeV ISR RFQ can be used as the beam injector of a new designed SFRFQ accelerating system, which is under the construction at Peking University.

    HTML

Reference (1)

目录

/

DownLoad:  Full-Size Img  PowerPoint
Return
Return