×
近期发现有不法分子冒充我刊与作者联系,借此进行欺诈等不法行为,请广大作者加以鉴别,如遇诈骗行为,请第一时间与我刊编辑部联系确认(《中国物理C》(英文)编辑部电话:010-88235947,010-88236950),并作报警处理。
本刊再次郑重声明:
(1)本刊官方网址为cpc.ihep.ac.cn和https://iopscience.iop.org/journal/1674-1137
(2)本刊采编系统作者中心是投稿的唯一路径,该系统为ScholarOne远程稿件采编系统,仅在本刊投稿网网址(https://mc03.manuscriptcentral.com/cpc)设有登录入口。本刊不接受其他方式的投稿,如打印稿投稿、E-mail信箱投稿等,若以此种方式接收投稿均为假冒。
(3)所有投稿均需经过严格的同行评议、编辑加工后方可发表,本刊不存在所谓的“编辑部内部征稿”。如果有人以“编辑部内部人员”名义帮助作者发稿,并收取发表费用,均为假冒。
                  
《中国物理C》(英文)编辑部
2024年10月30日

Test Stand Design and Construction for High Intensity Cyclotron Developement

Get Citation
ZHANG Tian-Jue, LI Zhen-Guo, CHU Cheng-Jie, YAO Hong-Juan, GE Tao, JI Bin and ZHONG Jun-Qing. Test Stand Design and Construction for High Intensity Cyclotron Developement[J]. Chinese Physics C, 2008, 32(S1): 237-240.
ZHANG Tian-Jue, LI Zhen-Guo, CHU Cheng-Jie, YAO Hong-Juan, GE Tao, JI Bin and ZHONG Jun-Qing. Test Stand Design and Construction for High Intensity Cyclotron Developement[J]. Chinese Physics C, 2008, 32(S1): 237-240. shu
Milestone
Received: 2008-01-10
Revised: 1900-01-01
Article Metric

Article Views(3330)
PDF Downloads(1154)
Cited by(0)
Policy on re-use
To reuse of subscription content published by CPC, the users need to request permission from CPC, unless the content was published under an Open Access license which automatically permits that type of reuse.
通讯作者: 陈斌, [email protected]
  • 1. 

    沈阳化工大学材料科学与工程学院 沈阳 110142

  1. 本站搜索
  2. 百度学术搜索
  3. 万方数据库搜索
  4. CNKI搜索

Email This Article

Title:
Email:

Test Stand Design and Construction for High Intensity Cyclotron Developement

    Corresponding author: ZHANG Tian-Jue,

Abstract: In order to study the technology on cyclotron design, and to carry out researches on the crucial parts including the main magnet, beam diagnostics and engineering technology to accomplish the experimental verification of the 100MeV high intensity cyclotron and to pave the way for further increasing the current of the proton beam, a series of work has been done in succession since 2004, which highlights the research, design and fabrication of some of the critical parts. The technical requirement for each part has been reached consecutively. At present, all the work has been integrated into a set of comprehensive device, CRM Cyclotron, which is actually a test stand for high intensity cyclotron development. This report will lay emphasis on the following: the CRM Cyclotron design and fabrication of relevant equipment, magnetic field mapping and shimming, 10—15mA H- ion source, experimental research on RF cavity and injection system, beam commissioning on the internal target system, etc.

    HTML

Reference (1)

目录

/

DownLoad:  Full-Size Img  PowerPoint
Return
Return