×
近期发现有不法分子冒充我刊与作者联系,借此进行欺诈等不法行为,请广大作者加以鉴别,如遇诈骗行为,请第一时间与我刊编辑部联系确认(《中国物理C》(英文)编辑部电话:010-88235947,010-88236950),并作报警处理。
本刊再次郑重声明:
(1)本刊官方网址为cpc.ihep.ac.cn和https://iopscience.iop.org/journal/1674-1137
(2)本刊采编系统作者中心是投稿的唯一路径,该系统为ScholarOne远程稿件采编系统,仅在本刊投稿网网址(https://mc03.manuscriptcentral.com/cpc)设有登录入口。本刊不接受其他方式的投稿,如打印稿投稿、E-mail信箱投稿等,若以此种方式接收投稿均为假冒。
(3)所有投稿均需经过严格的同行评议、编辑加工后方可发表,本刊不存在所谓的“编辑部内部征稿”。如果有人以“编辑部内部人员”名义帮助作者发稿,并收取发表费用,均为假冒。
                  
《中国物理C》(英文)编辑部
2024年10月30日

Get Citation
CHEN Jia-Er, GUO Zhi-Yu, LU Yuan-Rong, GAO Shu-Li, ZHU Kun, WANG Zhi, YAN Xue-Qing, PENG Shi-Xiang, ZHAO Jie, GUO Ju-Fang, LI Wei-Guo, YU Mao-Lin, YUAN Zhong-Xi and FANG Jia-Xun. R&D Status of SFRFQ Accelerating System[J]. Chinese Physics C, 2008, 32(S1): 231-233.
CHEN Jia-Er, GUO Zhi-Yu, LU Yuan-Rong, GAO Shu-Li, ZHU Kun, WANG Zhi, YAN Xue-Qing, PENG Shi-Xiang, ZHAO Jie, GUO Ju-Fang, LI Wei-Guo, YU Mao-Lin, YUAN Zhong-Xi and FANG Jia-Xun. R&D Status of SFRFQ Accelerating System[J]. Chinese Physics C, 2008, 32(S1): 231-233. shu
Milestone
Received: 2008-01-10
Revised: 1900-01-01
Article Metric

Article Views(3347)
PDF Downloads(727)
Cited by(0)
Policy on re-use
To reuse of subscription content published by CPC, the users need to request permission from CPC, unless the content was published under an Open Access license which automatically permits that type of reuse.
通讯作者: 陈斌, [email protected]
  • 1. 

    沈阳化工大学材料科学与工程学院 沈阳 110142

  1. 本站搜索
  2. 百度学术搜索
  3. 万方数据库搜索
  4. CNKI搜索

Email This Article

Title:
Email:

R&D Status of SFRFQ Accelerating System

    Corresponding author: CHEN Jia-Er,

Abstract: A new linear accelerating structure SFRFQ was proposed to transfer the RFQ inter-vane voltage to the inter-longitudinal accelerating gap voltage so as to improve the acceleration efficiency. A SFRFQ prototype is being constructed to explore its feasibilities, which will be installed behind the 1MeV ISR RFQ and accelerates the O+ beam from 1MeV to 1.6MeV. A high power SFRFQ model cavity was designed and tested, which has proved that an accelerating voltage higher than 70kV could be applied. A magnetic triplet matching section was designed to realize the beam matching between 1MeV ISR RFQ and SFRFQ. The upgrading of 1MeV ISR RFQ has been carried out smoothly, and its output beam current has reached 2mA.

    HTML

Reference (1)

目录

/

DownLoad:  Full-Size Img  PowerPoint
Return
Return